Call : +91-612-2520417,  2529892, 2529893
           
TiruvantPuram City AG
Site Plan
Specifications  
Foundation R.C.C cast site/Under-reammed Pile Foundation or as per structural design
Super Structure R.C.C Framed Structure as/ Design, with 5" filler wall as per design
Flooring Standard make Vitrified Glazed tiles.
Wood Work: Door-All door frame will be hard wood & all door panel will be 32 mm thick flush door 
Window-Wooden.
Finishing Internal Wall- two coat of P.O.P., External Wall-weather proof paint over combination of Birla Putty (5'-0" glazed tiles dado in toilets & 2'-0" glazed tiles dado over kitchen Platform.)
Fitting All fitting shall be standard make company.
Fixture All Fixture shall be standard make company.
Electrical Standard make company.
All floor plans specification amenities facilities are subject to revision
Mode of Payment
At the of booking and registration 30%
At the time of Plinth 25%
At the time of Ground floor slab casting 10%
At the time of brick work 10%
At the time of plaster 10%
At the time of flooring 10%
Before from the date of Possession 5%
  100%
   
2BHK (1075 Sq/ft) Booking Charge 30% of total amount.
  Starting From :- Dec 2016
  Possession Date :- Dec 2020
3BHK (1268 Sq/ft) Booking Charge 30% of total amount.
  Starting From :- Dec 2016
  Possession Date :- Dec 2020
3BHK (1560 Sq/ft) Booking Charge 30% of total amount.
  Starting From :- Dec 2016
  Possession Date :- Dec 2020
   

 

Floor Plan

Super Delux
 
   
Login   Web Mail Developed By : S-Tech Solutions